Jensen Omega 3S Complete Garment Tunnel Finishing
EUROPE (Western and Northern)
Comprising:
3 x DVT Superjet automatic garment loading systems.
Utilising the Jensen “lobster” collapsible hanger format
these three loading stations transport loaded hangers onto the main transport conveyor leading to:
1 x Jensen Omega 3S, steam heated garment tunnel finishing system.
Fully rebuilt in 2016 this steam heated machine has a capability of around 600 – 700 garments per hour.
This discharges to an out-take rail leading to a fully automated garment folding system from Biko Laundry Systems
comprising:
1 x Kuka (Supplied by Biko) Robotic arm.
This automatically unloads garments from the hangers places garments on the in-feed nose of the garment folding machine
1 x Biko Lauren, automatic garment folding machine
automatically french-folds and makes up to two cross-folds (knife and reversing belt execution)
before stacking on a discharge conveyor at the rear.
The whole system is in excellent condition and was supplied brand-new in 2016